Blog › Turn supplier billing instructions into a team checklist

How to turn a customer's supplier billing instructions into a checklist your team can use

Every commercial customer has its own invoicing rules, spread across guides, POs and emails. This is a method for turning them into one checklist per customer.

· 6 min read · By Closebill

Large air handling unit in a commercial plant room

Where a customer's billing instructions live

Ask three people in your office what a particular customer needs on an invoice and you may get three answers. That is because the instructions rarely sit in one place. For a typical retail chain, property manager or FM provider, they are spread across:

  • A supplier or trade partner guide. Often a PDF. ServiceChannel, for example, publishes trade partner guidelines for providers in its managed program, covering work order statuses, proposals and invoicing.
  • Per-entity invoicing checklists. CBRE's supplier information page lists a separate supplier invoice checklist for each UK legal entity, and tells suppliers to check which terms and conditions are named on the relevant purchase order.
  • The PO or work order itself. Instructions printed on the order may add to or replace the general guide.
  • The customer's portal. Required fields, attachment slots and help pages.
  • The contract. Rates, payment terms and any schedule of required documents.
  • Emails. "From next month please include the store number in the invoice description." These are the easiest to lose.

The first job is to collect these in one folder per customer, with the date you received each one.

Reading a supplier guide for billing requirements

Supplier guides mix billing rules with onboarding steps, safety rules and marketing. Read with a single question in mind: what would make this customer refuse or hold an invoice? Mark every sentence that answers it. Look in particular for:

  • References that must appear: PO, work order, store or site number, cost center
  • Which legal entity to invoice, and its tax number
  • Work order status needed before invoicing
  • Spend limits: NTE, PO value, approval limits, and how to get an increase
  • Required attachments: service report, photos, timesheet, parts receipts, subcontractor invoices
  • Itemization: how labor, materials, trip charge and freight should be broken out
  • Tax treatment
  • Submission channel and format: portal, email address type, PDF rules
  • Time limits: how soon after completion, and the cut-off after which you cannot bill
  • One invoice per work order or PO, and how to submit corrections

Watch for words like "must", "will be rejected", "required" and "only". Those are your rules. "Should" and "best practice" are worth noting, but may not stop payment.

Turning each requirement into a rule

A sentence in a guide is not yet something your team can check. Rewrite each one as a rule with four parts:

  1. Check: what must be true, stated so the answer is yes or no.
  2. Applies to: which jobs, such as all jobs, reactive only, jobs over a certain value, or one region.
  3. Evidence: what proves it, such as a field on the invoice, a status in the portal or an attached file.
  4. Who fixes it: technician, dispatcher, service coordinator or billing.

Here is how requirements from published guides become rules:

Source wordingRuleEvidenceWho fixes
Invoices without a valid PO reference will be rejected (CBRE UK checklist)PO number present and in the customer's current formatPO field on invoiceBilling; dispatcher if never received
Only one PO number can be used on an invoice (CBRE UK checklist)Exactly one PO on the invoiceInvoiceBilling
Make sure your work order is closed so that your invoice can be processed (ServiceChannel)Work order status is completed or closed in the customer's systemPortal statusTechnician or coordinator
Invoice needs to be within the agreed NTE amount (ServiceChannel)Invoice total is at or below the approved NTENTE on work order, approval file if increasedService coordinator
Take before and after photos and attach them to the work order (ServiceChannel)At least one before and one after photo attachedPhoto files on jobTechnician
Submit your invoice within 10 days of the Completed/Confirmed status (ServiceChannel)Days from completion to submission is 10 or fewerJob datesBilling

Keep the source next to each rule: the document, its date and the page. When someone asks "why do we do this?", you can show them.

When the instructions are silent

Guides do not cover every case. A job may involve a site that is not on the customer's list, a work order type the guide does not mention, or a status you cannot see. Do not let the team guess. Add a standing rule to every checklist: if a requirement is unclear or a status is unknown, the job goes to a named person to decide. Note what they decided, and if it will happen again, turn the decision into a new rule.

Keeping versions when the customer changes the rules

Customers change their instructions. They move to a new procurement system, change their PO format, add an attachment or merge legal entities. CBRE's UK checklist, for example, announces a new PO structure in its Coupa system. If you simply edit your checklist, you lose the ability to say which rules applied to a job billed last month.

Treat each customer's rule sheet as a versioned document:

  • Version number, increasing by one with each change.
  • Effective date, and whether it applies by job completion date or by invoice submission date. Pick one and use it for every customer.
  • What changed, in one or two lines.
  • Source: the new guide, email or portal notice that triggered it.
  • Approved by and the date.

Keep the old versions. When a customer queries an old invoice, you need to know what the rules were when it was sent. When a new version takes effect, look again at open jobs that have not been submitted yet, because they may now need something they did not need yesterday.

Who approves the rules

One person should approve each version, usually the billing lead or finance lead. Technicians and coordinators should be able to suggest changes, since they often hear about them first, but the approved sheet is the one everyone works from. Without a single approver, you end up with a printout on one desk, an updated spreadsheet on another and a technician's memory of what the customer said last year.

The approver's job is to check three things before signing off: the rule matches the source, it is written as a yes-or-no check, and the person who fixes it knows it exists.

Getting the checklist to the people who use it

Split each customer's rules by who acts on them:

  • Field rules go on the job card or in the mobile app for that customer's jobs: photos, signatures, check-in and check-out, calling in before going over the NTE. Our guide to signed service reports covers the field side in detail.
  • Office rules go on the billing team's pre-submission checklist: PO, entity, rates, tax, format, timing. See the general pre-submission checklist for a starting point.

Review each customer's sheet when you receive new instructions and, at minimum, once a quarter. Use your returns log to spot missing rules: if a customer returns an invoice for a reason not on its sheet, the sheet needs a new line. Our guide to first-pass acceptance shows how to keep that log.

Closebill keeps each customer's rules as versioned rule sheets approved by your billing lead, and checks every completed job against the version in force. See how it works.

Start with the customers who return the most

You do not need to write rule sheets for every customer at once. Start with the two customers whose returned invoices cost you the most. Book a job review and we will check 30 of your completed jobs against those customers' instructions and show you which requirements were missed.